Coolant tank refitted.
 

Clutch pedal box fitted as well as air intake hose.


Fitted new pipes for the power steering and clipped across the front chassis with new bolts, rivnuts and brackets. 


Protected all the fixings. 


Cleaning up the UJs on the steering column and greased up. Replaced the copper seals to the fuel filter. Stripped the EGR circuit from the wire loom back to bulkhead. Replaced all the insulation tape and conduit on the loom. Cleaned up all the earth points and connectors. Fitted the exhaust hangers and rubbers.


Exposed the metal surface of the gearbox cross member as it is used as an earth connection to the chassis.