Thursday, 5 August 2021

Engine Fire Up


Setting the clutch pedal - 140mm from floor plate to bottom of pedal (no rubber).


Had to grind down a spanner to work in the limited space in the clutch pedal box.


Fitted some heat shrink wrap to the battery cable on the starter motor.


Inlet manifold.


Bled the power steering box.


Intercooler and radiator fitted.

A late night session with Christopher fitting the propshafts.


Connected the fuel lines, starter electrics and fuel pump relay. Once we managed to get the fuel pump to prime (long story) it fired it first time.


Then we took it out for a test drive. Happy days.

Engine and Gearbox Refit


It's going to be a long day!!


Lined up nicely - taking time and being very careful. Much up/down/angle/shift/squirm/etc...


Oh yes!


Yes. Yes. And Yes!

Engine Bay Ancillaries


Coolant tank refitted.
 

Clutch pedal box fitted as well as air intake hose.


Fitted new pipes for the power steering and clipped across the front chassis with new bolts, rivnuts and brackets. 


Protected all the fixings. 


Cleaning up the UJs on the steering column and greased up. Replaced the copper seals to the fuel filter. Stripped the EGR circuit from the wire loom back to bulkhead. Replaced all the insulation tape and conduit on the loom. Cleaned up all the earth points and connectors. Fitted the exhaust hangers and rubbers.


Exposed the metal surface of the gearbox cross member as it is used as an earth connection to the chassis.

More Corrosion Protection

Protected the gearbox and engine mount brackets.


Decided to mask off and protect all of the inside of the bulk head. 
 

Clutch Fitted


New bolts on the flywheel all torqued up.


New HD clutch.


New clutch cover.