Setting the clutch pedal - 140mm from floor plate to bottom of pedal (no rubber).
Had to grind down a spanner to work in the limited space in the clutch pedal box.
Fitted some heat shrink wrap to the battery cable on the starter motor.
Inlet manifold.
Bled the power steering box.
Intercooler and radiator fitted.
A late night session with Christopher fitting the propshafts.
Connected the fuel lines, starter electrics and fuel pump relay. Once we managed to get the fuel pump to prime (long story) it fired it first time.
Then we took it out for a test drive. Happy days.
No comments:
Post a Comment